Skip to content
About
Main content
Law

What you are billed

The metered quantity is never the useful work. It is a proxy that the vendor can observe, attribute to you and defend.

Metered quantity
the metered quantity
Granularity
the increment you are charged in
Rate
the price per unit

Trade-off: Cost as a substitutable resource

How it behaves

One input on the horizontal axis, the others held fixed.

Data table
Billed ÷ used, by job length (60-second minimum increment)
Job length (seconds)Billed ÷ used
160×
1.0855.4×
1.1751.1×
1.2747.2×
1.3843.6×
1.4940.2×
1.6237.1×
1.7534.3×
1.931.6×
2.0529.2×
2.2227×
2.4124.9×
2.6123×
2.8321.2×
3.0619.6×
3.3218.1×
3.5916.7×
3.8915.4×
4.2214.2×
4.5713.1×
4.9512.1×
5.3611.2×
5.8110.3×
6.299.54×
6.818.8×
7.388.13×
87.5×
8.666.93×
9.386.39×
10.25.9×
115.45×
11.95.03×
12.94.64×
144.29×
15.23.96×
16.43.65×
17.83.37×
19.33.11×
20.92.87×
22.62.65×
24.52.45×
26.52.26×
28.72.09×
31.11.93×
33.71.78×
36.51.64×
39.61.52×
42.91.4×
46.41.29×
50.31.19×
54.51.1×
591.02×
63.91.88×
69.31.73×
751.6×
81.31.48×
881.36×
95.41.26×
1031.16×
1121.07×
1211.48×
1311.37×
1421.27×
1541.17×
1671.08×
1811.33×
1961.23×
2121.13×
2301.04×
2491.2×
2701.11×
2921.03×
3161.14×
3431.05×
3711.13×
4021.04×
4361.1×
4721.02×
5111.06×
5541.08×
6001×

Worked examples, recomputed

Every number the mechanisms quote for this relationship is recomputed from it, so none of them disagrees with it.

Where it appears

Each mechanism states it in its own names. The general symbol each name stands for is shown with it.